top of page
A stylish guest house with a dark roof, white walls, large windows, and a covered patio, s

Build Your Scottsdale ADU with Total Confidence

Arizona’s new ADU laws are a game-changer. Our Permit-Guaranteed Package breaks down every rule, handles the paperwork, and delivers a finished casita in as little as 90 days.

Got Ur Six Custom Builders Logo
Modern Tiny Home Guest House at twilight. .jpg

Get Your Free Checklist

How did you hear?

60-Second Eligibility Test

Zoned single-family residential (R1)

Lot setbacks allow a 5 ft side & rear clearance for a detached unit

Desired ADU ≤ 1,000 sq ft or ≤ 75 % of the main home

You can keep code-minimum parking for the main residence

Total adults on site won’t exceed six (city occupancy cap)

Fail one item? – book the free call; we’ll explore variances or design tweaks

ADU Checklist
Feasibility Scan — Days 0-3

GIS lot overlay, utility locate, HOA / CC&R review

Concept & Pre-Application — Days 4-14

3-D model, rough budget, city pre-app meeting.

Permit Docs — Days 15-45

Stamped plans, energy calc, structural & MEP sheets.

Fast-Track Build — Days 46-106

Panelized shell; on-site finish begins.

Final Inspection — Days 107-112

Punch-list, warranty hand-off, 5-star review request.

bottom of page