60-Second Eligibility Test
✔ Zoned single-family residential (R1)
✔ Lot setbacks allow a 5 ft side & rear clearance for a detached unit
✔ Desired ADU ≤ 1,000 sq ft or ≤ 75 % of the main home
✔ You can keep code-minimum parking for the main residence
✔ Total adults on site won’t exceed six (city occupancy cap)
Fail one item? – book the free call; we’ll explore variances or design tweaks

Feasibility Scan — Days 0-3
GIS lot overlay, utility locate, HOA / CC&R review
Concept & Pre-Application — Days 4-14
3-D model, rough budget, city pre-app meeting.
Permit Docs — Days 15-45
Stamped plans, energy calc, structural & MEP sheets.
Fast-Track Build — Days 46-106
Panelized shell; on-site finish begins.
Final Inspection — Days 107-112
Punch-list, warranty hand-off, 5-star review request.